PROJECTS UNDERTAKEN
Load Testing of Dock Floor for a PSU Shipyard:
Load Testing of Dock Floor for 3 Dry Docks
Generation of Layout Drawings for a PSU Shipyard:
Survey, Measurement and Generation of Layout drawings for 2 Dry Docks including the Dry Dock Gates.
Providing Project Management Services during successful execution for construction, test & trial of two number Caisson Gates & Intermediate Gate built for Indian Navy.
Prepared “As Built Drawings” and Operation & Maintenance Manual for the Caisson Gates.
Preparation of a Docking Plan for ICGS of 150m Length.
Preparation of Methodology for Special Repair of Critical Structure for a Coast Guard Ship.
Bid documentation for a ship to be constructed by a PSU Shipyard:
Basic Design
Statement of Technical Requirements
Designing Water-tight door between Pump House and Sill Jetting Room.
Layout of Barges (Oil & Water)
Preparation of General Arrangement as part of Bid Documentation
Technical services for a modified Oil Barge including change of Classification.
Preparation Inclining Experiment documentation using Ballast water in lieu of Solid Weights
Obtaining approval of documentation from Indian Register of Shipping & Director General of Indian Shipping
Conduct of Inclining Experiment
Generation of Sounding Table for a modified Tanker’s Cargo Tanks
Design review, technical assessment and liaison with IRS for drawing
approval for a ship under construction by a PSU Shipyard:
Weather-tight Door, Fixed windows & Fixed Scuttles
Designing of a Modular Pontoon
Basic and Detail Design of Gangways and Berthing Pontoon.
Conducting of Inclining Experiment for Ship and Caisson Gate.
Design for conversion of a “Sand Barge” to a “Bunker Barge
Undocking of an Oil Rig from an Indian Shipyard
ON-GOING PROJECTS
Project Management Consultancy Services for Construction, Test & Trial of Electro mechanical work of a 280m Dry Dock for M/s HCC.
Technical documentation for modification of pipeline between jacket and refinery for an Oil Company
Preparation of a Stability Booklet for Crane Operation from a Barge
One of the Partners is leading Project for new construction of 8 different types of Caisson Gates and 3 different types of Mitre Gates to be fitted in Dry Docks/ Wet Basin with another diversified company.
Inclining Experiment for a converted “Sand Barge” to a “Bunker Barge”
Design Study for revival & Augmentation of RBD Slipway No 1
Reach us
Contact us
710, 7th floor, Mayuresh Cosmos, Sector 11,
CBD Belapur, Navi Mumbai,
Maharashtra-400614.
Email: admin@apcmarinetech.com
Contact No- +91 91670 56172 /+91 99304 04619
Mobile No- +91 93201 64680