PROJECTS UNDERTAKEN

Load Testing of Dock Floor for a PSU Shipyard:

 Load Testing of Dock Floor for 3 Dry Docks

 Generation of Layout Drawings for a PSU Shipyard:

 Survey, Measurement and Generation of Layout drawings for 2 Dry Docks including the Dry Dock Gates.

 Providing Project Management Services during successful execution for construction, test & trial of two number Caisson Gates & Intermediate Gate built for Indian Navy.

 Prepared “As Built Drawings” and Operation & Maintenance Manual for the Caisson Gates.

 Preparation of a Docking Plan for ICGS of 150m Length.

 Preparation of Methodology for Special Repair of Critical Structure for a Coast Guard Ship.

Bid documentation for a ship to be constructed by a PSU Shipyard:

 Basic Design

 Statement of Technical Requirements

 Designing Water-tight door between Pump House and Sill Jetting Room.

 Layout of Barges (Oil & Water)

 Preparation of General Arrangement as part of Bid Documentation

 Technical services for a modified Oil Barge including change of Classification.

 Preparation Inclining Experiment documentation using Ballast water in lieu of Solid Weights

 Obtaining approval of documentation from Indian Register of Shipping & Director General of Indian Shipping

 Conduct of Inclining Experiment

 Generation of Sounding Table for a modified Tanker’s Cargo Tanks

Design review, technical assessment and liaison with IRS for drawing
approval for a ship under construction by a PSU Shipyard:

 Weather-tight Door, Fixed windows & Fixed Scuttles

 Designing of a Modular Pontoon

 Basic and Detail Design of Gangways and Berthing Pontoon.

 Conducting of Inclining Experiment for Ship and Caisson Gate.

 Design for conversion of a “Sand Barge” to a “Bunker Barge

 Undocking of an Oil Rig from an Indian Shipyard

ON-GOING PROJECTS

 Project Management Consultancy Services for Construction, Test & Trial of Electro mechanical work of a 280m Dry Dock for M/s HCC.

 Technical documentation for modification of pipeline between jacket and refinery for an Oil Company

 Preparation of a Stability Booklet for Crane Operation from a Barge

 One of the Partners is leading Project for new construction of 8 different types of Caisson Gates and 3 different types of Mitre Gates to be fitted in Dry Docks/ Wet Basin with another diversified company.

 Inclining Experiment for a converted “Sand Barge” to a “Bunker Barge”

 Design Study for revival & Augmentation of RBD Slipway No 1

Reach us

Contact us

710, 7th floor, Mayuresh Cosmos, Sector 11,

CBD Belapur, Navi Mumbai,

Maharashtra-400614.

 

Email: admin@apcmarinetech.com

Contact No- +91 91670 56172 /+91 99304 04619 

Mobile No- +91 93201 64680